Payment:
TT/LCProduct Origin:
ChinaColor:
RedShipping Port:
FuZhouLead Time:
30Order(MOQ):
1Goods Stock:
1001 ton~4 ton construction building 3 phase electric wire rope hoist
Its main products include:
PLC construction lifts.
Low, medium, and high-speed variable frequency construction lifts.
Special purpose construction lifts, such as power plant cold water tower construction lifts, mini rack construction lifts for tower crane, and mine construction lifts.
Inclined construction lifts.
Small rack observation lift.
High-level test bed maintenance lift.
Other OEM type rack and pinion vertical lift.
Characteristic | Model | Rated Loading | Lifting Speed | Motor Power | |
Double cages | SC200/200 | 2x2000kg | 33m/min | 2x(3x11kw) / 2x(3x8.5kw) | |
SC150/150 | 2x1500kg | 33m/min | 2x(2x13kw) | ||
SC100/100 | 2x1000kg | 33m/min | 2x(2x11kw) | ||
Single cage | SC200 | 2000kg | 33m/min | 3x11kw /3x8.5kw | |
SC150 | 1500kg | 33m/min | 2x13kw | ||
SC100 | 1000kg | 33m/min | 2x11kw | ||
Double cages | Low speed | SC200/200D | 2X2000kg | 0-40m/min | 2x(3x11kw)/2x(3x8.5kw) |
SC100/100D | 2x1000kg | 0-40m/min | 2x(2x13kw) | ||
Mid speed | SC200/200Z | 2x2000kg | 0-60m/min | 2x(2x23kw) | |
SC100/100Z | 2x1000kg | 0-60m/min | 2x(2x15kw) | ||
Single cage | Low speed | SC200 | 2000kg | 0-40m/min | 3x11kw /3x8.5kw |
SC100 | 1000kg | 0-40m/min | 2x13kw | ||
Mid speed | SC200 | 2000kg | 0-60m/min | 2x23kw | |
SC100 | 1000kg | 0-60m/min | 2x15kw |
Item | Construction hoist |
Model | SC100/100/SC200/200 |
Rated capacity/per cage | 1000kg-2000kg |
Lifting speed | 0-63m/min,0-42m/min,0-33m/min |
Cage size | 3.2*1.5*2.4m |
Motor power | 3*15kw/3*11/2*15/3*18.5 |
Speed ratio | 1:18 /1:16 |
Invertor Power | 45 kW/37kw |
Safety device | SAJ40-1.2/SAJ40-1.4/SAJ30-1.2 |
Mast section size | 0.65*0.65*1.508m |
Max. Installation height | 300m |
Cable type | Cable basket/cable trolley |
Our company abides by the business philosophy of "quality first, customer first" to ensure product quality. We have rigorous production procedures, and each production process is carried out under strict quality inspection.Only after passing the inspection can they move on to the next procedure. At the same time, we insist on creating a neat, clean and safe working environment.
Completed safety measures Of Construction Hoist
1. Equiping with Anti-falling govenor
2. Electrical an Mechanical interlock: Door safety switches, Slack rope switch
3. Safety hook
4. Upper and bottom limit swithes, trap door limit switch
5. Overload protector
6. Bottom Buffer
7. Frequecy Conversion (Inverter) can be choose
8. PLC Control system can be choose
9. Level Calling system and Auto leveling device to be choose.
On large projects, clients benefit from our input at pre-planning stage to help determine exact lifting requirements. With our comprehensive service, we can advise clients on the most suitable access solution as well as providing the desired level of design input at any stage of the process.
We pay all our attention for CE approved Materials Passenger hoist Building Construction Hoist design and manufacturing.
|Certificates