Material hoists are used in many configurations and load capacities, and are limited only to those places that require moving material up and down without workers on board. Transport Platforms are definitely a niche product focusing on commercial
Material hoists are used in many configurations and load capacities, and are limited only to those places that require moving material up and down without workers on board. Transport Platforms are definitely a niche product focusing on commercial
| Availability: | |
|---|---|
| Quantity: | |
GYT construction hoist is a heavy-duty vertical transportation solution designed for construction, renovation, and building addition projects. It is engineered to move large numbers of personnel and materials efficiently between floors. This equipment is divided into double-cage and single-cage models, with variable speed options ranging from low to mid-speed to meet diverse project requirements. The hoist is also suitable for temporary industrial work, plant shutdowns, and turnaround projects, and it can be integrated with scaffolding systems for low-to-mid-rise commercial buildings and historical building renovations.
The hoist covers a rated loading range from 1000kg to 2000kg per cage, with a maximum lifting speed of 60m/min. It ensures fast and stable transportation of construction materials and workers, effectively shortening project timelines.
It offers multiple models, including SC200/200 double-cage and SC100 single-cage versions. Users can choose between fixed-speed and frequency conversion (inverter) control systems according to project needs.
The mast section adopts a 0.65×0.65×1.508m standard structure, supporting a maximum installation height of 300m. This design adapts to high-rise construction scenarios while ensuring long-term operational stability.
Safety is the top priority of GYT construction hoist, equipped with a comprehensive safety protection system:
Anti-falling governor: Prevents cage free-fall in case of mechanical failure.
Electrical & mechanical interlocks: Includes door safety switches and slack rope switches to avoid misoperation.
Limit switches & overload protector: Upper/bottom limit switches and trap door limit switches prevent over-travel. The overload protector avoids equipment damage caused by overloading.
Bottom buffer & safety hook: The bottom buffer reduces impact during landing, and the safety hook provides double protection for the lifting mechanism.
Optional intelligent functions: PLC control system, level calling system, and auto-leveling device can be customized to improve operational accuracy and safety.

Characteristic | Model | Rated Loading | Lifting Speed | Motor Power |
Double cage | SC200/200 | 2×2000kg | 33m/min | 2×(3×11kw)/2×(3×8.5kw) |
Double cage (Low speed) | SC200/200D | 2×2000kg | 0-40m/min | 2×(3×11kw)/2×(3×8.5kw) |
Double cage (Mid speed) | SC200/200Z | 2×2000kg | 0-60m/min | 2×(2×23kw) |
Single cage | SC100 | 1000kg | 33m/min | 2×11kw |
General Specs | - | 1000-2000kg per cage | 0-60m/min | 3×11kw to 2×23kw |
Cage Size | - | 3.2×1.5×2.4m | - | - |
Max Installation Height | - | 300m | - | - |
Item | Construction hoist |
Model | SC100/100/SC200/200 |
Rated capacity/per cage | 1000kg-2000kg |
Lifting speed | 0-63m/min,0-42m/min,0-33m/min |
Cage size | 3.2*1.5*2.4m |
Motor power | 3*15kw/3*11/2*15/3*18.5 |
Speed ratio | 1:18 /1:16 |
Invertor Power | 45 kW/37kw |
Safety device | SAJ40-1.2/SAJ40-1.4/SAJ30-1.2 |
Mast section size | 0.65*0.65*1.508m |
Max. Installation height | 300m |
Cable type | Cable basket/cable trolley |
We adhere to the business philosophy of quality first, customer first. Each production process is strictly inspected, and products can only enter the next process after passing the test.
Our construction hoists have obtained multiple certifications, including special equipment manufacturing license, SGS certification, and Shaanxi construction lifting equipment recommendation certificate, ensuring compliance with international and domestic standards.
We provide pre-planning consulting services for large projects, helping clients determine lifting requirements and design the most suitable access solutions according to project characteristics.

It is widely used in building construction, renovation, temporary industrial operations, and scaffolding installation/dismantling projects.
Yes, we support customization of speed, cage size, and control systems, including frequency conversion and PLC control options.
Standard configurations include anti-falling governor, limit switches, overload protector, and electrical interlocks, with optional intelligent systems available.
The maximum installation height can reach 300m, adapting to high-rise construction needs.



